Gymnasium
| Implementation date: | 18.03.2025. |
|---|---|
| Production time: | 30 day |
| Installation time: | 7 day |
A completed project. Our company equipped the school with a 12-row telescopic electric bleacher in a very short timeframe. To ensure the seats’ durability, we used molded polyurethane foam filled into a metal frame.
Installed seats — https://kaskadseating.com/catalog/teatralnye-kresla/kaskad-ulychenie/
| Implementation date: | 18.03.2025. |
|---|---|
| Production time: | 30 day |
| Installation time: | 7 day |